uxv 500 Werkplaats-Handboek : Bladzijde 365

Microfiches
Image preview

Bladzijde 363

Image preview

Bladzijde 364

Image preview

Bladzijde 366

Image preview

Bladzijde 367

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 315 320 325 330 335 340 345 350 355 360 365 370 375 380 385 390 395 400 405 410 415 420 425 430 435 440 445 450 455 460 462
          14. FRONT WHEEL/FRONT SUSPENSION/
     STEERING SYSTEM                                            UXV 500



 INSTALLATION                                     Nut/Washer


 Install the wheel hub, washer and nut.
 Apply grease onto the wheel hub splines.

 Apply the front brake and then tighten the
 nut to the specified torque.

 Torque: 7 kgf-m (70 N-m, 50 lbf-ft)

 Install the cotter pin and band ends of cotter
 pin.
                                                   Cotter Pin





    Do not apply oil to the seat of the nut.
    Do not loosen the wheel hub nut after
    torque tightening. If the wheel hub nut
    groove is not aligned with the cotter
    pin hole, align groove with the hole by
    tightening up on the wheel hub nut.


 Always use a new cotter pin.




                                                                14-6