uxv 500 Werkplaats-Handboek : Bladzijde 243

Microfiches
Image preview

Bladzijde 241

Image preview

Bladzijde 242

Image preview

Bladzijde 244

Image preview

Bladzijde 245

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 315 320 325 330 335 340 345 350 355 360 365 370 375 380 385 390 395 400 405 410 415 420 425 430 435 440 445 450 455 460 462
          8. CYLINDER HEAD/VALVES                                                                      UXV 500



 Apply engine oil to cylinder head bolt (No.
 1 ­ 8) threads.

 Install the four bolts (No. 5 ­ 8).
 Install the four bolts/washers (No. 1 ­ 4).
 Tighten the holder bolts (No. 1 ­ 8) in a
 crisscross pattern in five steps to the specified
 torque as follow diagram.


                             Tighten the bolts to the specified torque in sequence
                                              kgf-m (N-m, lbf-ft)
                       (1)        (2)     (3)    (4)          (5)        (6)    (7)    (8)

        Step 1    2.4 (24, 17)                            1.2 (12, 9)                  

        Step 2    3.8 (38, 27)                            2.3 (23, 17)                 

        Step 3    4.8 (48, 35)                       




                                                           NOTE: Install the camshafts. a point for
                                                           attention.

                                                     Confirm the camshaft turned smoothly.
                                                     Check while camshafts are at the engine compression
                                                     TDC poisition and have clearance for free play of both
                                                     rotation and axial directions.
8-13